Draft Report The Mid-Term Review has been presented to the GEF Council at its November 2008 session in the form of a Working Document, as an Information Document, and in the form of a powerpoint presentation. The final draft report will be based on the draft technical papers below: 1. Context and Methodology 2. Design of the RAF 3. RAF Allocations and Utilization 4. Implementation of the RAF 5. Delphi Study of the GEF RAF Benefits and Indices (Full report 3.2 MB)6. Effects of the RAF on the Small Grants Programme7. Stakeholder Survey Annex8. Comparative Review of PBA Systems9. Sources of Data for the GEF RAF IndicesAbbreviationsStatistical Annex #1 on simulationsStatistical Annex #2 on allocations and portfolioStatistical Annex #3 on quintilesStatistical Annex #4 on classificationOther technical papers and supporting documents will be added to this webpage before November 2008. Comments on the draft technical papers are welcome. Please provide comments or queries to rafevaluation@thegef.org. Thank you in advance for your feedback.
The Mid-Term Review has been presented to the GEF Council at its November 2008 session in the form of a Working Document, as an Information Document, and in the form of a powerpoint presentation. The final draft report will be based on the draft technical papers below:
1. Context and Methodology 2. Design of the RAF 3. RAF Allocations and Utilization 4. Implementation of the RAF 5. Delphi Study of the GEF RAF Benefits and Indices (Full report 3.2 MB)6. Effects of the RAF on the Small Grants Programme7. Stakeholder Survey Annex8. Comparative Review of PBA Systems9. Sources of Data for the GEF RAF IndicesAbbreviations
Statistical Annex #1 on simulationsStatistical Annex #2 on allocations and portfolioStatistical Annex #3 on quintilesStatistical Annex #4 on classificationOther technical papers and supporting documents will be added to this webpage before November 2008. Comments on the draft technical papers are welcome. Please provide comments or queries to rafevaluation@thegef.org. Thank you in advance for your feedback.
Other technical papers and supporting documents will be added to this webpage before November 2008.
Comments on the draft technical papers are welcome. Please provide comments or queries to rafevaluation@thegef.org. Thank you in advance for your feedback.
OPS4
Full Report
OPS4: Webcast from Barcelona. November 3, 2009
Presentation @ Replenishment 10/2009Annexes and DocumentsComments by Senior Independent Advisors Evaluation of the LDC Fund
Full ReportAnnexes and Documents
ODS Impact Evaluation Report
Vol 1: Conclusions and Recommendations
Vol 2: Country Reports ACPER 2009: Cameroon, Egypt, and Syria
Coming Soon:
APR 2008
AIR 2009
Jan. 6: BBL on How the GEF can be complementary to the CDM?, Washington, DC