Methyl Bromide Phase-Out Project

Project Summary

Feb 2005. WP inclusion.During project preparation it appeared that:1) Ukraine wishes to retain capacity for MBr production.2) MBr consumption is significant.3) CTC was produced in one facility, mostly as feedstock for CFC-11/12 in the USSR. Ukraine seeks assistance to close that facility which has been idle since 1998.As a result, the project design addresses the above reality and seeks to:1) Phase out MBr consumption in the grain sector and reduce use for Quarantine and Pre-shipment.2) Permanently close the existing CTC production facility, and compensate the Oriana-Halev enterprise that owns it.3) Capacity building : policy development to support MBr phase out and institutional strengthening to increase the capacity of the Ministry of Environment to meeting its obligations to control and report on ODS phase out efforts.4) Project implementation, monitoring and evaluation.(As recorded by the PM at pipeline entry:"The proposed project aims to assist the Ukraine in achieving compliance with the Copenhagen Amdendment of the Montreal Protocol by enabling closure of its Methyl bromide production facilities and delivering technical assistance for other required control measures.")

Project Details

GEF Project ID
2147
Project Type
Full-size Project
Status
Cancelled
Country
Ukraine
Region
Focal Areas
Funding Source
GEF Trust Fund
Implementing Agencies
The World Bank
Executing Agencies
Coordination Committee for Montreal Protocol Implementation. Specific components executed by Ministry of Agriculture or Ministry of Environmental Protection.
GEF Project Manager
Laurent Granier |

Financials

Project Preparation Grant Amount
0 USD
GEF Project Grant
4,700,000 USD
Co-financing Total
4,760,000 USD
GEF Agency Fees
423,000 USD
Total Cost 9,460,000.00 USD

Project Timeline

Project Cancelled
31 Jan 2008